Under Construction. Scheduled for completion in January 2027, the Boca Ciega Low Country is a new construction residence within the Virginian Collection by Canopy Builders.


Property

Website:https://www.nestseekers.com/5656295
Address:
ST PETERSBURG, FL 33703
Ownership: Fee Simple
Type: Single Family
Bedrooms: 6 BR
Bathrooms: 4
Lot Size: 0.1 Acres

Financials

Price:$1,475,000
Annual Taxes:$2,498.35

Description

Under Construction. Scheduled for completion in January 2027, the Boca Ciega Low Country is a new construction residence within the Virginian Collection by Canopy Builders. This boutique collection includes six Canopy homes located along 47th Avenue North on high-and-dry land in Arcadia Gardens, part of the greater Allendale neighborhood. Thoughtfully designed and impeccably finished, the property includes a 2,796-square-foot main residence and a 558-square-foot detached accessory dwelling unit above a two-car garage. The main home offers four bedrooms, three full bathrooms, a study that can serve as a fifth bedroom, a mudroom, and a second-story loft. The detached ADU includes one bedroom, one bathroom, a kitchen, laundry closet, and a spacious walk-in closet. A generous backyard separates the two structures and offers ample room for a future pool. Inside, the foyer makes an immediate impression with custom millwork, while the powder bath creates a statement with designer wallpaper. Custom cabinetry is incorporated throughout the home, adding both character and thoughtful functionality. The open floor plan of the main home features a large kitchen with a generous island, a great room, and a dedicated dining area that together create an ideal space for entertaining. The chef’s kitchen features designer plumbing and lighting fixtures, a walk-in pantry, pot filler, KitchenAid appliance package, and custom cabinetry with soft-close drawers and doors. Upstairs, a versatile loft offers endless possibilities as an entertainment zone, playroom, or additional living area, while the thoughtfully designed laundry room features sleek cabinetry, soapstone countertops, a storage closet, and a sink. The expansive primary suite is a true sanctuary, highlighted by dual walk-in closets, a double-sink vanity, freestanding soaking tub, walk-in shower, and water closet. Carrara marble finishes elevate the space with sophistication. Every detail of this home has been meticulously curated, including Hardie Board plank siding, a tankless gas water heater, impact-resistant windows, engineered hardwood flooring throughout, dual digital thermostats for separate climate control, 10-foot ceilings on the main level, 9-foot ceilings upstairs, a gas sconce on the front porch, and 8-foot interior doors. The generous backyard offers the perfect canvas for a dream outdoor oasis, whether you envision a sparkling pool, lush landscaping, or a peaceful retreat. Located just minutes from Downtown St. Petersburg, Vinoy Park, award-winning Gulf beaches, and approximately 20 minutes from Tampa, this exceptional home presents a rare opportunity. Schedule a meeting to learn more about the upgrades and interior design selections curated for this home.

Amenities

  • Bb Hs Internet Available
  • Convection Oven
  • Dishwasher
  • Disposal
  • Eat-in Kitchen
  • Electricity Connected
  • Gas Water Heater
  • High ceiling
  • Kitchen Family Room Combo
  • Lighting
  • Living Room/Dining Room Combo
  • Microwave
  • Natural Gas Connected
  • Open Floorplan
  • Pest Guard System
  • Primarybedroom Upstairs
  • Public
  • Rain Gutters
  • Range Hood
  • Refrigerator
  • Sewer Connected
  • Sidewalk
  • Solid Wood Cabinets
  • Stone Counters
  • Tankless Water Heater
  • Thermostat
  • Walk-In Closet(s)
  • Water Connected

Contact

888 Biscayne Blvd # Unit CU9 Miami, FL 33132
Listing Courtesy of KELLER WILLIAMS ST PETE REALTY

ST PETERSBURG FL 33703 USA