Nest Seekers

Under Construction. Scheduled for completion in January 2027, the Rainwater by David Weekley Homes is a luxurious three story City Home in Emerald Landing at Waterside.

SARASOTA, FL 34240

Listing

Web ID:5712420
Website:https://www.nestseekers.com/5712420

Property

Ownership: Fee Simple
Type: Townhouse
Bedrooms: 2 BR
Bathrooms: 3½
Pets: Pets Allowed
Lot Size: 0.0 Acres

Financials

Price:$889,990
Annual Taxes:$4,082.14
Common charges:$283

Description

Under Construction. Scheduled for completion in January 2027, the Rainwater by David Weekley Homes is a luxurious three-story City Home in Emerald Landing at Waterside. Ideally positioned on lot 34 along the shoreline of 100-acre Kingfisher Lake & with no rear neighbors, this waterfront residence offers captivating views and convenient access to the shopping, dining, and entertainment of Waterside Place. Offering 2,258 square feet of thoughtfully designed living space, the home features three bedrooms and three-and-a-half baths. The first floor welcomes you with a spacious bedroom complete with a private bath and walk-in closet—an ideal setting for overnight guests, a home office, or flexible living arrangements. The second floor serves as the heart of the home, featuring an open-concept design that connects the kitchen, dining, and living areas. The gourmet kitchen showcases a statement 10-foot island, wine cooler, cooktop, designer vent hood, and built-in refrigerator. Just beyond the living room, a covered balcony provides an inviting place to relax and enjoy picturesque views of Kingfisher Lake. Occupying the third floor, the Owner’s Retreat offers a peaceful private escape with water views, two generous walk-in closets, and a spa-inspired en-suite bath featuring a freestanding tub and walk-in shower with a rainfall showerhead. Hurricane-impact windows with included blinds provide added comfort, privacy, and peace of mind. An oversized two-car garage with an epoxy-coated floor completes this exceptional home. Emerald Landing residents enjoy resort-style amenities, including a pool with lap lanes, cabanas, an entertainment lawn, pickleball courts, a fire pit, dog park, boat dock, water-taxi service, and scenic walking and jogging paths overlooking Kingfisher Lake. Experience an exceptional combination of waterfront living, sophisticated design, and proximity to the vibrant lifestyle of Waterside Place. Contact us today to schedule a personalized appointment. **This property offers a limited time 7% employee pricing incentive.

Amenities

  • Balcony
  • Bb Hs Internet Available
  • Built-In Oven
  • Buyer Approval Required
  • Cable - Available
  • Clubhouse
  • Community Mailbox
  • Cooktop
  • Dishwasher
  • Dog Park
  • Double Pane Windows
  • Electricity Available
  • In Wall Pest System
  • Irrigation Reclaimed Water
  • Landscaped
  • Low Emissivity Windows
  • Maintenance
  • Microwave
  • Natural Gas Available
  • Open Floorplan
  • Paved
  • Pickleball Courts
  • Pool
  • Primarybedroom Upstairs
  • Public
  • Range Hood
  • Refrigerator
  • Sewer Connected
  • Shade Shutter(S)
  • Sidewalk
  • Sidewalks
  • Smoke Detectors
  • Solid Surface Counters
  • Storm Window(s)
  • Tankless Water Heater
  • Thermostat
  • Trails
  • Tray Ceiling(s)
  • Walk-In Closet(s)
  • Water
  • Water Available
  • Wine Refrigerator
  • Front Exterior Rendering **Paint Colors May Vary
  • Floor Plan First Floor
  • Floor Plan Second Floor
  • Floor Plan Third Floor
  • Interior Design Selections
  • Interior Design Selections
  • Interior Design Selections
  • Community Amenities
  • Community Amenities
  • Community Amenities
  • Community Amenities
  • Community Amenities
  • Community Amenities
  • Community Amenities

Location

SARASOTA FL 34240 USA

Contact

Miami, FL
888 Biscayne Blvd # Unit CU9 Miami, FL 33132
Phone: +1 305-203-4555
Fax: +1 305-675-0745
jm@nestseekers.com
Listing Courtesy of WEEKLEY HOMES REALTY COMPANY
​
Nest Seekers Logo
Loading...