200 East 66th Street Apt: D2005
New York, NY 10065
Cross street:Third Avenue

Building

Type:Mid-rise
Era:Pre-war
Floors:20

Property

Ownership: Condo
Rooms: 6
Bedrooms: 3 BR
Bathrooms: 3
Pets: No Pets Allowed

Financials

Price:$4,750,000
Common charges:$3,955
Real estate tax:$2,829
Financing Allowed:10%
Minimum down:$4,275,000
505 Park Ave, New York, NY 10022
Listing Courtesy of Serhant LLC

Price Improvement ! ! Sun Drenched 3BR 3BA Condo with 2 Private Balconies and Sweeping Open City Views !

Description

Price Improvement!! Sun-Drenched 3BR/3BA Condo with 2 Private Balconies and Sweeping Open City Views!

Introducing Penthouse D2005, a sophisticated 3-bedroom, 3-bathroom residence perched atop the iconic Manhattan House condominium, a celebrated New York City landmark renowned for its timeless architecture and exceptional lifestyle amenities.

This exceptional corner residence features two private uncovered balconies, sweeping open city views, abundant natural light, and a thoughtfully designed layout that beautifully balances comfort, elegance, functionality and indoor/outdoor living.

A gracious entry gallery leads into an impressive great room spanning over 24 feet, where oversized windows frame breathtaking skyline vistas and flood the space with natural light throughout the day. Anchored by a wood-burning fireplace and complemented by direct access to a private balcony, the living and dining areas provide an ideal setting for both sophisticated entertaining and everyday living.

The windowed open kitchen is thoughtfully designed with a breakfast bar, wine refrigerator, exceptional storage, an enormous pantry, and effortless flow to the main living spaces.

The oversized primary suite is a true retreat featuring its own private balcony, incredible sunlight and views, custom built-ins, and an enormous professionally designed walk-in closet rarely found in Manhattan. The enormous bedroom also features a built-in desk/home office setup. The spa-like, windowed en-suite primary bath is beautifully appointed with dual vanities, a soaking tub, a separate glass-enclosed shower and radiant heated floors. Two additional generously proportioned, light-filled bedrooms , one with an en-suite bath, offer exceptional closet space and flexibility for guests, family, or home office use.

Additional features include state-of-the-art smart home technology, integrated audio, Nest thermostats, an in-unit washer and dryer, custom lighting throughout, extensive built-in cabinetry, remarkable closet space at every turn, and a layout that offers both openness and privacy in equal measure. Plus, 2 dedicated storage cages transfer with the apartment!

Located within the iconic Manhattan House, one of the Upper East Side's most distinguished full-service condominiums, residents enjoy an unparalleled suite of amenities. Designed by renowned architect Gordon Bunshaft of Skidmore, Owings & Merrill and designated a New York City landmark, Manhattan House offers two porte-cochere entrances, 24-hour doorman and concierge services, resident manager, valet service, state-of-the-art fitness center, newly designed children's playroom, bicycle storage, private storage, and an on-site garage. The crown jewel of the building is the spectacular 10,000-square-foot rooftop club featuring resident lounge complete with floor to ceiling windows, kitchen facilities and outdoor lounge seating- perfect for entertaining, relaxing, sunbathing, or simply enjoying fresh air with panoramic city views.

Amenities

Bike Room; Driveway; Garage; Wheelchair Access; Garden; Health Club; Fitness Room; Sauna; Laundry Room; Valet; Nursery; Party Room; Roof Deck; Cold Storage; Private Storage;
  • Balcony
  • Washer / Dryer
  • Elevator
  • Fitness Facility
  • Full service
  • Garage
  • Garden
  • Laundry Room
  • Roof Deck

Neighborhood

More listings:

OLR IDX

RLS Data display by Nest Seekers LLC.

All information furnished regarding property for sale, rental or financing is from sources deemed reliable, but no warranty or representation is made as to the accuracy thereof and same is submitted subject to errors, omissions, change of price, rental or other conditions, prior sale, lease or financing or withdrawal without notice. International currency conversions where shown are estimates based on recent exchange rates and are not official asking prices.

All dimensions are approximate. For exact dimensions, you must hire your own architect or engineer.