Property
| Ownership: | Fee Simple |
|---|---|
| Type: | Townhouse |
| Bedrooms: | 2 BR |
| Bathrooms: | 3½ |
| Pets: | Pets Allowed |
| Lot Size: | 0.0 Acres |
Financials
Price:$889,990
Annual Taxes:$4,082.14
Common charges:$283
Listing Courtesy of WEEKLEY HOMES REALTY COMPANY
Under Construction. Scheduled for completion in January 2027, the Rainwater by David Weekley Homes is a luxurious three story City Home in Emerald Landing at Waterside.
Front Exterior Rendering **Paint Colors May Vary
Description
Under Construction. Scheduled for completion in January 2027, the Rainwater by David Weekley Homes is a luxurious three-story City Home in Emerald Landing at Waterside. Ideally positioned on lot 34 along the shoreline of 100-acre Kingfisher Lake & with no rear neighbors, this waterfront residence offers captivating views and convenient access to the shopping, dining, and entertainment of Waterside Place. Offering 2,258 square feet of thoughtfully designed living space, the home features three bedrooms and three-and-a-half baths. The first floor welcomes you with a spacious bedroom complete with a private bath and walk-in closet—an ideal setting for overnight guests, a home office, or flexible living arrangements. The second floor serves as the heart of the home, featuring an open-concept design that connects the kitchen, dining, and living areas. The gourmet kitchen showcases a statement 10-foot island, wine cooler, cooktop, designer vent hood, and built-in refrigerator. Just beyond the living room, a covered balcony provides an inviting place to relax and enjoy picturesque views of Kingfisher Lake. Occupying the third floor, the Owner’s Retreat offers a peaceful private escape with water views, two generous walk-in closets, and a spa-inspired en-suite bath featuring a freestanding tub and walk-in shower with a rainfall showerhead. Hurricane-impact windows with included blinds provide added comfort, privacy, and peace of mind. An oversized two-car garage with an epoxy-coated floor completes this exceptional home. Emerald Landing residents enjoy resort-style amenities, including a pool with lap lanes, cabanas, an entertainment lawn, pickleball courts, a fire pit, dog park, boat dock, water-taxi service, and scenic walking and jogging paths overlooking Kingfisher Lake. Experience an exceptional combination of waterfront living, sophisticated design, and proximity to the vibrant lifestyle of Waterside Place. Contact us today to schedule a personalized appointment. **This property offers a limited time 7% employee pricing incentive.
Amenities
- Balcony
- Bb Hs Internet Available
- Built-In Oven
- Buyer Approval Required
- Cable - Available
- Clubhouse
- Community Mailbox
- Cooktop
- Dishwasher
- Dog Park
- Double Pane Windows
- Electricity Available
- In Wall Pest System
- Irrigation Reclaimed Water
- Landscaped
- Low Emissivity Windows
- Maintenance
- Microwave
- Natural Gas Available
- Open Floorplan
- Paved
- Pickleball Courts
- Pool
- Primarybedroom Upstairs
- Public
- Range Hood
- Refrigerator
- Sewer Connected
- Shade Shutter(S)
- Sidewalk
- Sidewalks
- Smoke Detectors
- Solid Surface Counters
- Storm Window(s)
- Tankless Water Heater
- Thermostat
- Trails
- Tray Ceiling(s)
- Walk-In Closet(s)
- Water
- Water Available
- Wine Refrigerator
All information furnished regarding property for sale, rental or financing is from sources deemed reliable, but no warranty or representation is made as to the accuracy thereof and same is submitted subject to errors, omissions, change of price, rental or other conditions, prior sale, lease or financing or withdrawal without notice. International currency conversions where shown are estimates based on recent exchange rates and are not official asking prices.
All dimensions are approximate. For exact dimensions, you must hire your own architect or engineer.